In practice one cabinet usually means three orders at three companies: an electrical designer draws the schematic, an assembler builds, an integrator programs and commissions. At Amister one company carries out all three stages: electricians and PLC programmers are separate teams that work together on every project, so when commissioning shows that a signal sits on a different terminal than in the program, the fix does not require a complaint to a subcontractor.
This page is about how to order control cabinet assembly from Amister and what you get.
- New line or machine. The cabinet must be ready in parallel with the mechanics, so that commissioning does not wait for the electrics.
- Control upgrade. Replacing the controller with a Siemens S7-1500 or adding new stations requires rebuilding the cabinet or a new cabinet next to the existing one.
- Line relocation. When machines move between plants (we did this, among others, for Mercedes-Benz in Arnstadt and Hilite in Ostrava), some cabinets have to be built anew for the new power supply and hall layout.
- Documentation ready, no contractor. You have schematics from your own design office or from the machine manufacturer and need someone to build the cabinet exactly to them.
- No documentation. You only have a signal list and process requirements. Then we start with an EPLAN design and only then build.
| 1. EPLAN design or review of your documentation | Our EPLAN designers prepare schematics, device layout and the bill of materials according to process requirements and customer standards. If you supply ready documentation, we check it for completeness (power supply, protection, terminal marking) and build 1:1. |
| 2. Component ordering | We buy enclosures and devices from suppliers we work with daily: Rittal, Siemens, ABB, Schneider Electric, Eaton, Wago. Typical components (wiring ducts, terminal strips, cables, ferrules) are in stock, which shortens lead time; non-standard components are ordered for the project. You can also supply your own material. |
| 3. Assembly and wiring in our own hall | Electricians mount the backplate, devices, controller and wiring in the assembly hall in Piekary Śląskie, next to the stations where we assemble machine mechanics at the same time. Design changes are entered into the documentation as we go. |
| 4. Inspection and as-built documentation | Before shipping we check the cabinet against the schematic and prepare as-built documentation. |
| 5. Delivery, installation and commissioning | We deliver the cabinet to the plant, carry out electrical installation: cable routes and connecting field devices and commission the control system together with PLC programmers. You can also collect the cabinet alone and commission it with your own team. |
- Wired and labelled cabinet according to the schematic: devices, terminals, wire and terminal markers.
- EPLAN as-built documentation with changes made during assembly.
- Bill of materials and components from the suppliers listed in stage 2, with manufacturers’ documents.
- PLC and HMI program, if you also order PLC programming from us: after commissioning we hand over the source code.
- Installation and commissioning at the plant on request: electrical installation, signal tests (I/O check) and support up to handing the line over to production.
| Scope | In-house at the plant | Control cabinet assembly at Amister |
|---|---|---|
| Electrical design | an EPLAN designer or an external office is needed | EPLAN designers on the team, design and assembly in one company |
| Components | purchasing from several suppliers, lead times on the plant’s side | regular suppliers (Rittal, Siemens, ABB, Schneider Electric, Eaton, Wago), typical accessories in stock |
| Place of assembly | a station in the plant, often during production | 700 m² of our own assembly hall, built in parallel with the mechanics |
| Changes during the work | documentation updated after the fact or not at all | changes entered into EPLAN as we go |
| Commissioning | electrician, assembler and programmer from three companies | electricians and PLC programmers from one company, one Team Leader responsible for the whole |
| When it is a good choice | one simple enclosure, a design exists and an electrician is free | cabinet for a line or machine, start-up deadline, documentation to hand over |
- A single cabinet without documentation. Building “from memory” ends with a cabinet nobody can service later. First we make an EPLAN design (even for one cabinet), then we build. If you only need the design, we do it separately.
- Components outside the catalogue of suppliers we use. We will build a cabinet from customer-supplied material, but then we are responsible for assembly according to the schematic, not for the parameters and delivery dates of the supplied devices. We say this before the quote, not after.
- Design changes during assembly. Every change is entered into EPLAN first and only then into the cabinet. This extends a single fix by the time needed to update the documentation, but the cabinet and the schematic always match, which saves days of troubleshooting at commissioning.
We work to the standards of large corporate customers, e.g. the VAG group or Daimler.
EPLAN designers, electricians and PLC programmers work in one company, and one Team Leader runs the whole order and is responsible for the cabinet and commissioning.
We build cabinets in our hall in Piekary Śląskie in parallel with the assembly of the machine mechanics, and before shipping we check each one against the schematic.
We build cabinets and commission controls for OEM plants and Tier 1 suppliers, and we staff the team to match the project language: Polish, German or English.
We work in a certified ISO 9001:2015 quality system and are members of VDMA, the German Mechanical Engineering Industry Association.